Skip to content
Nodal EngineeringEngineering Consultancy

Tamakhani Integrated Settlement Plan

An integrated resettlement scheme on a Kavre hillside — houses stepped along the contours, a shared community block, an access spine and a gated entrance.

District
Kavrepalanchowk
Category
Settlement Planning
Client
Local Government, Kavrepalanchowk
Year
2022
Status
completed
Tamakhani Integrated Settlement Plan
Project
Tamakhani Integrated Settlement Plan
District
Kavrepalanchowk
Category
Settlement Planning
Year
2022

About the project

Integrated settlements are usually drawn as a grid and then forced onto the hill. Here the houses step along the contours instead, which cuts the earthwork sharply and gives every unit a level plinth and a view down the valley.

A single access spine climbs through the settlement, widening at intervals into shared space. The long community block sits at the entrance where it is reached first, and each house keeps its own garden plot behind.

Scope of work

  • 01Contour survey and geotechnical assessment
  • 02Integrated settlement planning
  • 03Housing unit design and structural detailing
  • 04Access road, retaining structures and drainage
  • 05Community facility design
  • 06Cost estimate and implementation plan